ANALISIS FINANSIAL PEMANFAATAN AMPAS TEBU (BAGASSE) SEBAGAI BAHAN BAKAR PEMBANGKIT LISTRIK DI PT GUNUNG MADU PLANTATIONS
DOI:
https://doi.org/10.23960/jiia.v7i3.3768
Abstract
This research aimed to analyse the financially of feasibility and break even point of power plant. This is a case study at PT Gunung Madu Plantations, Lampung. Data collection was conducted in May 2017 and was analyzed by financially analysis and break even point analysis. The investment of power plant at PT Gunung Madu Plantations financially wass feasible, with NPV value of Rp1,437,425,146,844; Net B/C of 7.00; Gross B/C of 1.81, IRR of 34.84 percent, and payback periode of 1.75. Amount of revenue and electricity produced by PT Gunung Madu Plantations has reached break even point. The result of this analysis showed that the average of BEP revenue was Rp32,548,133,618 and BEP electricity production was 49,994,808 KWh.
Key words: bagasse, break even point, financially
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).